- Planning and project management.
 
- Drawing up the layout of the Wind Park and micrositing.
 
- Road access and land demarcation.
 
- Foundation works and surrounding preparation.
 
- WTG erection, cable installation, jointing and connection.
 
- Installation of a transmission station or substation including internal lines.
 
- Grid connection and testing of electrical equipment.
 
- Installation of turbines and torqueing.
 
- Electricity board and electrical inspectorate permission.
 
- Commissioning of substation and wind turbines