Concept to commissioning – Wind Project

  • Planning and project management.
  • Drawing up the layout of the Wind Park and micrositing.
  • Road access and land demarcation.
  • Foundation works and surrounding preparation.
  • WTG erection, cable installation, jointing and connection.
  • Installation of a transmission station or substation including internal lines.
  • Grid connection and testing of electrical equipment.
  • Installation of turbines and torqueing.
  • Electricity board and electrical inspectorate permission.
  • Commissioning of substation and wind turbines